长沙理工检测咨询有限责任公司,湖南长沙 410076
U448.215
莫永祥.高墩六跨预应力混凝土连续刚构桥合龙顺序研究[J].公路与汽运,2024,40(4):103-107+123. MOYongxiang. Research of closing sequence of six-span prestressed concrete continuous rigid frame bridge with high piers[J]. Highways & Automotive Applications,2024,40(4):103-107+123.
复制